Jack was part of a team that carried out a Due Diligence report on this group of mines for the New York stock market.
|
|
Jack worked for five years at Maamba coal mine, where he was teaching blasting, plus; rehabilitation of the coal washing plant, design and construction of a magnetite processing plant, re-organising the stores, managing the fabrication shop, workshops and component rebuild facilities. |
|
Surface Mining |
|
Overburden removal and the high wall at Maamba Collieries Zambia as blasted by Jack.
In its first year the Demag required a new slew ring and a new engine. |
|
Jack is a Fellow Member of the Institute of Materials, Minerals and Mining. He is also registered with the Engineering Council as a Chartered Engineer. |
|
Office tel: + 44 (0) 161 624 2916 E-mail: mining@ntlbusiness.com |
|
Jack preparing a typical blast using ANFO gelignite and detonating cord.
Jack supervised the entire rehabilitation of this coal washing plant. |
|
Contact Jack
Office tel: + 44 (0) 161 624 2916 Office fax: + 44 (0) 161 627 0594
E-mail: mining@ntlbusiness.com E-mail: jack@miningis.com |


|
Jack produced shell designs and rescheduling data for the extension of 8 iron ore mines in Peru. |





|
Jack has been consulting to this group of copper and cobalt mines since 2005. |